News

CNC lathe complete leveling work, before turning on the power, you should do the following:

1 Make sure the ground wire is connected correctly (installation resistance is less than 10Ω). ,

2 Tighten the screws on the terminal.

3 Re-check each connector is connected tightly.

4 Make sure the device PCB firmly intact.

5 Check to make sure the correct input power phase.